This was a sloping site which needed to be constructed over a split level. We constructed a 70m long x 3m high insitu retaining wall which created the split level. We also constructed the two storey concrete frame for the new building.
Main scope of works was
Drainage and attenuation systems
Services and utilities
Foundations and substructures
Concrete frame construction, including shear walls columns and floors