Case Study

This was a sloping site which needed to be constructed over a split level. We constructed a 70m long x 3m high insitu retaining wall which created the split level. We also constructed the two storey concrete frame for the new building.

Main scope of works was

Drainage and attenuation systems

Services and utilities

Foundations and substructures

Concrete frame construction, including shear walls columns and floors