Case Study

New students' residence to replace disused and derelict Spreytonway House. The new building will create 131 new, on-campus rooms to meet growing demand from future students.

We are building up to ground floor slab and also a 60m long x 3m high insitu retaining wall.

Our scope typically consisted of;-

  • Concrete substructure
  • Drainage and Services
  • Retaining Walls
  • Shear Walls
  • Columns
  • Concrete Decks
  • External Walls

The site was very tight and required the use a tower crane to aid the build process and logistics management.