Cookie Consent by FreePrivacyPolicy.com
Case Study

A brand new multi-million-pound state of the art sport and leisure center project on land that will be transformed into a parkland leisure destination. Trim trail, pedestrian and cycle access along with the leisure center which will house 2 pools, gym, studios, café, sports hall, and 250 space car park

The plans for the new center will see the land turned into a parkland leisure destination, including a trim trail with activity stations, pedestrian and cycle access from Hermitage Recreation Ground and Stephenson College, and a high ropes course within the woodland. The center itself will include:

  • Eight lane 25-meter main pool, and a learner pool with moveable floor
  • 120 station gym, 25 spin cycles, and two exercise studios
  • Café with healthy eating options
  • Eight court sports hall and three squash courts
  • Changing Places facility accessible from the lobby
  • Clip ‘n’ Climb
  • Sauna, steam, and spa pool.
  • 250 car spaces

Hannafin to deliver a full groundwork & civil scope and will be there for the duration of the works, with completion expected Q3 2021

Our Typical scope comprises of;-

  • Enabling Works
  • Excavation
  • Foundations
  • Pool construction
  • Formwork
  • Drainage
  • Roads, paths and surfacing
  • Hard Landscaping