New build, three storey, steel frame structure on the abandoned site of the original 12 acre, Grade 2 listed, former Springfield Brewery.
Located in the heart of the UK’s second city, Arden Gate comprises of 225 luxury apartments finished to the highest specifications and meticulous attention to detail.
Construction of a prestigious new ‘Head Quarters / Operations building, test track and storage facility for Jaguar Land Rover.
New students' residence to replace disused and derelict Spreytonway House. The new building will create 131 new, on-campus rooms to meet growing demand from future students.
Extension to the Global HQ of Jaguar Land Rover, of 9,250 sq ft over three floors, with associated test facilities, equipment and office space including a 220 space car park. This will also enable creation of a specialist storage system and airflow laboratory.
A new development of luxury houses and lodges in 78 acres of Parkland in Warwickshire, creating an age-exclusive village community including Country Club style facilities.
Canalside regeneration including a waterside residential quarter with retail and leisure spaces. The Icknield centre includes: Eight-lane, 25-metre competition pool, 250-capacity spectator seating area, Learner Pool, Steam Room, Sauna, Fitness Suite, Dance Studio, Wet and Dry Changing Facilities
Construction of a brand new prestigious Jaguar Land Rover showroom complex for Hatfield's Group built on the outskirts of Shrewsbury.
278 works on a main artery within the centre of Birmingham without which the redevelopment of the whole area and building demolition would not have been possible.
Construction of a new, state-of-the-art, leisure center in Sheringham. It will replace the existing Splash, which will remain open until the new center is complete. The development will result in a fun health and fitness complex, accessible to all. The center is due to open in summer 2021.
A grade 1 listed building, after 7 years planning was granted permission to be converted in to a 80-bedroom Luxury hotel and natural mineral water spa.The Pump Room served as an information centre for the duration of the project then was converted into a cafe.
Work is well underway for Phase 2 of the redevelopment of Beeston Square. The second phase will see an eight-screen cinema, as well as food and drink outlets and 132 new homes.
This is a new railway station at a rural junction where the Cotswold and Cross Country lines cross, near Norton, Worcester. This scheme will provide sustainable access to regional and national destinations by rail, including the south-west, north-east, London and the Thames Valley.
A new leisure center at Dudley is part of a multi-million-pound leisure center program and regeneration of the area. The new facility will include a 25metre swimming pool, teaching pool, four-court sports hall, gym, exercise studios, soft play area, and café.
Grundon Waste Station, new build 20,000sq metre waste facility serving businesses in Banbury and surrounding areas.
Gedling Access Road The Gedling Access Road (GAR) is a new 3.8km single carriageway road that will provide a link between the B684 Mapperley Plains and the A612 Trent Valley Road / Nottingham Road.
Works to deliver full civils and groundworks scope to construct the new 170-bedroom Marriott Courtyard hotel at Milton Gate, the gateway to the Milton Park business park near Didcot in South Oxfordshire
A new distribution station facility for Amazon to service the South West area of the UK. Packages will be shipped to the delivery station in Parc Erissey Industrial Estate from Amazon fulfilment and sortation centers and loaded onto vehicles to get delivered to customers.
Groundworks and civils to construct the Midland Metropolitan Hospital, a brand new state of the art hospital.
A brand new multi-million-pound state of the art sport and leisure center project on land that will be transformed into a parkland leisure destination. Trim trail, pedestrian and cycle access along with the leisure center which will house many more features
New build, modern development replacing the existing Moberly House. Increasing the number of rooms from around 140 to 220
RC Concrete sub and super structure works for the Macmillan Cancer Centre development, Chesterfield
To complete substructures and drainage to 12nr mainly two storey residential blocks across three separate sites within the existing Beacon Barracks MoD base.
An extension to the Northampton General Hospital entrance, road realignment, revised parking, and landscaping improvements to create a significant enhancement to the hospital and environment.
This £48m, 100,000sq ft, Leisure scheme is designed to reconnect the City Centre with Plymouth’s famous harbourside. Located adjacent to Drake Circus Shopping Centre the new leisure facility includes: 12 screen cinema 13 Restaurants Top floor bar area with panoramic views 420 Car parking spaces
A new veterinary hospital based at Keele University giving students, taking 5-year degrees, will gain invaluable experience in the hospital environment
New leisure centre on site of demolished old leisure centre. The new centre will be run by Birmingham Community Leisure Trust. The facility includes: 25 metre, 6 lane swimming pool Training/Learner pool Changing Facilities Fitness Studio Dance Studio
This new school development is constructed on the original school playground and sports pitches making way for more modern, state of the art classrooms. The development also includes a nature garden, four multi use games areas (MUGAs) and improved parking facilities.
Delivery of a Partnered Framework Approach to construct 5 new-build school facilities in and around Birmingham & Dudley,
The Construction of a new retail park extending the existing complex, delivered over circa 68 weeks in strategic phases.