This new school development is constructed on the original school playground and sports pitches making way for more modern, state of the art classrooms. The development also includes a nature garden, four multi use games areas (MUGAs) and improved parking facilities.
The Construction of a new retail park extending the existing complex, delivered over circa 68 weeks in strategic phases.
Located in the heart of the UK’s second city, Arden Gate comprises of 225 luxury apartments finished to the highest specifications and meticulous attention to detail.
To complete substructures and drainage to 12nr mainly two storey residential blocks across three separate sites within the existing Beacon Barracks MoD base.
A new development of luxury houses and lodges in 78 acres of Parkland in Warwickshire, creating an age-exclusive village community including Country Club style facilities.
This £48m, 100,000sq ft, Leisure scheme is designed to reconnect the City Centre with Plymouth’s famous harbourside. Located adjacent to Drake Circus Shopping Centre the new leisure facility includes: 12 screen cinema 13 Restaurants Top floor bar area with panoramic views 420 Car parking spaces
Construction of a brand new prestigious Jaguar Land Rover showroom complex for Hatfield's Group built on the outskirts of Shrewsbury.
New leisure centre on site of demolished old leisure centre. The new centre will be run by Birmingham Community Leisure Trust. The facility includes: 25 metre, 6 lane swimming pool Training/Learner pool Changing Facilities Fitness Studio Dance Studio
Construction of a new, state-of-the-art, leisure center in Sheringham. It will replace the existing Splash, which will remain open until the new center is complete. The development will result in a fun health and fitness complex, accessible to all. The center is due to open in summer 2021.
Delivery of a Partnered Framework Approach to construct 5 new-build school facilities in and around Birmingham & Dudley,
Work is well underway for Phase 2 of the redevelopment of Beeston Square. The second phase will see an eight-screen cinema, as well as food and drink outlets and 132 new homes.
New build, three storey, steel frame structure on the abandoned site of the original 12 acre, Grade 2 listed, former Springfield Brewery.
A new leisure center at Dudley is part of a multi-million-pound leisure center program and regeneration of the area. The new facility will include a 25metre swimming pool, teaching pool, four-court sports hall, gym, exercise studios, soft play area, and café.
Construction of a prestigious new ‘Head Quarters / Operations building, test track and storage facility for Jaguar Land Rover.
Gedling Access Road The Gedling Access Road (GAR) is a new 3.8km single carriageway road that will provide a link between the B684 Mapperley Plains and the A612 Trent Valley Road / Nottingham Road.
Extension to the Global HQ of Jaguar Land Rover, of 9,250 sq ft over three floors, with associated test facilities, equipment and office space including a 220 space car park. This will also enable creation of a specialist storage system and airflow laboratory.
A new distribution station facility for Amazon to service the South West area of the UK. Packages will be shipped to the delivery station in Parc Erissey Industrial Estate from Amazon fulfilment and sortation centers and loaded onto vehicles to get delivered to customers.
Canalside regeneration including a waterside residential quarter with retail and leisure spaces. The Icknield centre includes: Eight-lane, 25-metre competition pool, 250-capacity spectator seating area, Learner Pool, Steam Room, Sauna, Fitness Suite, Dance Studio, Wet and Dry Changing Facilities
A brand new multi-million-pound state of the art sport and leisure center project on land that will be transformed into a parkland leisure destination. Trim trail, pedestrian and cycle access along with the leisure center which will house many more features
278 works on a main artery within the centre of Birmingham without which the redevelopment of the whole area and building demolition would not have been possible.
A grade 1 listed building, after 7 years planning was granted permission to be converted in to a 80-bedroom Luxury hotel and natural mineral water spa.The Pump Room served as an information centre for the duration of the project then was converted into a cafe.
Works to deliver full civils and groundworks scope to construct the new 170-bedroom Marriott Courtyard hotel at Milton Gate, the gateway to the Milton Park business park near Didcot in South Oxfordshire
An extension to the Northampton General Hospital entrance, road realignment, revised parking, and landscaping improvements to create a significant enhancement to the hospital and environment.
A new veterinary hospital based at Keele University giving students, taking 5-year degrees, will gain invaluable experience in the hospital environment