Construction of retaining structures that are designed to hold back the natural sliding of materials, such as earth, stone, and silt. We specialise in the installation of various types of retaining systems that can be constructed of concrete, gabion cages, blocks, brick, and stones, to name a few.
A brand new multi-million-pound state of the art sport and leisure center project on land that will be transformed into a parkland leisure destination. Trim trail, pedestrian and cycle access along with the leisure center which will house many more features
Gedling Access Road The Gedling Access Road (GAR) is a new 3.8km single carriageway road that will provide a link between the B684 Mapperley Plains and the A612 Trent Valley Road / Nottingham Road.
A new leisure center at Dudley is part of a multi-million-pound leisure center program and regeneration of the area. The new facility will include a 25metre swimming pool, teaching pool, four-court sports hall, gym, exercise studios, soft play area, and café.
Construction of a brand new prestigious Jaguar Land Rover showroom complex for Hatfield's Group built on the outskirts of Shrewsbury.
New students' residence to replace disused and derelict Spreytonway House. The new building will create 131 new, on-campus rooms to meet growing demand from future students.
Located in the heart of the UK’s second city, Arden Gate comprises of 225 luxury apartments finished to the highest specifications and meticulous attention to detail.
RC Concrete sub and super structure works for the Macmillan Cancer Centre development, Chesterfield
New build, modern development replacing the existing Moberly House. Increasing the number of rooms from around 140 to 220
Groundworks and civils to construct the Midland Metropolitan Hospital, a brand new state of the art hospital.
Works to deliver full civils and groundworks scope to construct the new 170-bedroom Marriott Courtyard hotel at Milton Gate, the gateway to the Milton Park business park near Didcot in South Oxfordshire
A grade 1 listed building, after 7 years planning was granted permission to be converted in to a 80-bedroom Luxury hotel and natural mineral water spa.The Pump Room served as an information centre for the duration of the project then was converted into a cafe.
278 works on a main artery within the centre of Birmingham without which the redevelopment of the whole area and building demolition would not have been possible.
Extension to the Global HQ of Jaguar Land Rover, of 9,250 sq ft over three floors, with associated test facilities, equipment and office space including a 220 space car park. This will also enable creation of a specialist storage system and airflow laboratory.
New build, three storey, steel frame structure on the abandoned site of the original 12 acre, Grade 2 listed, former Springfield Brewery.
Delivery of a Partnered Framework Approach to construct 5 new-build school facilities in and around Birmingham & Dudley,
To complete substructures and drainage to 12nr mainly two storey residential blocks across three separate sites within the existing Beacon Barracks MoD base.